124364 ❲4K❳
: Pour 2-3 inches of gravel into the bottom of the hole before setting the post.
: A post-hole digger, level, and structural screws (like galvanized 3-inch wood screws) to help concrete grip the wood. Step-by-Step Installation 124364
: Drive several galvanized screws into the base of the post that will be submerged in concrete to create more surface area for the concrete to grip. : Pour 2-3 inches of gravel into the
: Fast-setting concrete usually takes 30-60 minutes to set and about 4 hours before you can continue working. Wait 24 hours for a full cure before applying heavy loads. Pro Tips for Extra Stability 124364